![]() |
Unassuming pile of Chromoly tubing |
![]() |
Monster X Cross |

After drafting the soon to be frame, the appropriate tube set is ordered. in this case, Nova Cycles made a custom Monster Cross kit for Black Ship Cycles that used lighter 29er tubing with the same rear triangle as the Icebreaker.


As soon as everything fit up properly and snug in the fixture, the front triangle is tack welded into place in sequence.
The piece then comes out of the fixture and onto the table for the finish welding, also done in sequence to prevent heat warpage and misalignment.
Once the front triangle is check on the alignment table, the rear triangle gets cut and fit, same as the front. The tubes are slotted for dropouts using a rotary cutting wheel and hand file, then the dropouts are inserted and aligned. Everything is tacked in the frame then welded in sequence on the table. The frame is then checked for alignment and clearance.

The next step is to cut, fit, and weld in the fender mounts. After that, the brazing will begin.
Part 2 - Brazing, Finishing: First, all of the brazed on small parts get dry fit and marked on the frame with sharpie. Holes are drilled for threaded mounts and other mounts are filed to match the curve of the tube. Once they are all set up and clean, each piece is clamped, fluxed, and brazed into place with either silver or bronze using an oxy/acetylene torch. The flux is cleaned of and all braze-ons are thoroughly checked, any adjustements are made.
Finally, the seat tube is notched and reamed, any inconsistencies are filed down, then the final alignment and quality check is done. Once everything passes inspection, it's off to the paint shop!



No comments:
Post a Comment