I'm experimenting with moving the Blog to my website via Weebly! Find it here----------->http://www.blackshipcycles.com/news--updates
Cheers!
Craft Bikery - Minneapolis Minnesota Twin Cities Hand Made Custom Chromoly Steel Bicycle Frames - Specializing in Commuter, Tour, Urban, Adventure, Winter, and Cargo/Work Rides
Saturday, January 28, 2017
Wednesday, June 1, 2016
Spring 2016 Update
Spring was quiet at the shop. I finished the Porter rack and rode it to the brewery many Monday nights to fill growlers just to make sure it worked ;), and did a few frame repairs for some great people.I plan on posting photos from those processes, as well as updating the website.

Summer is pretty much here, and I am excited about some new tools and new builds. I'll be updating more often. Watch the Instagram for current photos from in the shop!
Sunday, October 11, 2015
October shop news & schedule
We finished the move!
The workshop is still at 3530 E 28th St off the greenway.
I'll be in the shop everyday this week, working on Jamison's single wheel touring trailer, David's Icebreaker front and rear racks, and bike locking racks for the new Gamut Gallery!
If you have a repair or mod, project you want to discuss, a custom Icebreaker, or other winter bike this season, stop in!
Our new home office/mailing address is 1042 27th Ave SE, Apt C, 55414
Cheers!
Friday, September 18, 2015
Building the Black Ship Monster X Cross with Campy Athena EPS
Oh bother. This post was started months ago and got erased in the cyber-nethers. Let's crack a beer and see what happens:
(Or how to turn an unassuming pile of chromoly tubing into a sweet ride)
Design and Drafting: David and I collaborated on the design for this one. As an avid rider and owner of many custom bikes, he could tell me exactly what he wanted out of the frame. in this case, fast, aggressive but still comfy position in drop bars with Campy Athena EPS.
After drafting the soon to be frame, the appropriate tube set is ordered. in this case, Nova Cycles made a custom Monster Cross kit for Black Ship Cycles that used lighter 29er tubing with the same rear triangle as the Icebreaker.
Part 1 - Cutting, Fitting, Welding: Once the tubing showed up, the cutting and filing began. Rough cutting main tubes began with a chop saw, then mitered with bi-metal hole saws in the vertical mill. Once the tubes were notched, I perfected the fitting by hand filing and cleaning the joint. This was also a good time to drill out the enlarged bottom bracket holes to accommodate the electronic shifting wiring.
We marked all of our spots for the EPS wiring and drilled them out, then cleaned'em up with a hand file. This took a while, as neither one of us was very familiar with the group, but we found all the info we needed and it was a rewarding accomplishment to put a sweet custom spin on this bike.
As soon as everything fit up properly and snug in the fixture, the front triangle is tack welded into place in sequence.
The piece then comes out of the fixture and onto the table for the finish welding, also done in sequence to prevent heat warpage and misalignment.
Once the front triangle is check on the alignment table, the rear triangle gets cut and fit, same as the front. The tubes are slotted for dropouts using a rotary cutting wheel and hand file, then the dropouts are inserted and aligned. Everything is tacked in the frame then welded in sequence on the table. The frame is then checked for alignment and clearance.

The next step is to cut, fit, and weld in the fender mounts. After that, the brazing will begin.
Part 2 - Brazing, Finishing: First, all of the brazed on small parts get dry fit and marked on the frame with sharpie. Holes are drilled for threaded mounts and other mounts are filed to match the curve of the tube. Once they are all set up and clean, each piece is clamped, fluxed, and brazed into place with either silver or bronze using an oxy/acetylene torch. The flux is cleaned of and all braze-ons are thoroughly checked, any adjustements are made.
Finally, the seat tube is notched and reamed, any inconsistencies are filed down, then the final alignment and quality check is done. Once everything passes inspection, it's off to the paint shop!


The Monster X Cross!

![]() |
| Unassuming pile of Chromoly tubing |
![]() |
| Monster X Cross |
Design and Drafting: David and I collaborated on the design for this one. As an avid rider and owner of many custom bikes, he could tell me exactly what he wanted out of the frame. in this case, fast, aggressive but still comfy position in drop bars with Campy Athena EPS.After drafting the soon to be frame, the appropriate tube set is ordered. in this case, Nova Cycles made a custom Monster Cross kit for Black Ship Cycles that used lighter 29er tubing with the same rear triangle as the Icebreaker.
Part 1 - Cutting, Fitting, Welding: Once the tubing showed up, the cutting and filing began. Rough cutting main tubes began with a chop saw, then mitered with bi-metal hole saws in the vertical mill. Once the tubes were notched, I perfected the fitting by hand filing and cleaning the joint. This was also a good time to drill out the enlarged bottom bracket holes to accommodate the electronic shifting wiring.
We marked all of our spots for the EPS wiring and drilled them out, then cleaned'em up with a hand file. This took a while, as neither one of us was very familiar with the group, but we found all the info we needed and it was a rewarding accomplishment to put a sweet custom spin on this bike.As soon as everything fit up properly and snug in the fixture, the front triangle is tack welded into place in sequence.
The piece then comes out of the fixture and onto the table for the finish welding, also done in sequence to prevent heat warpage and misalignment.
Once the front triangle is check on the alignment table, the rear triangle gets cut and fit, same as the front. The tubes are slotted for dropouts using a rotary cutting wheel and hand file, then the dropouts are inserted and aligned. Everything is tacked in the frame then welded in sequence on the table. The frame is then checked for alignment and clearance.

The next step is to cut, fit, and weld in the fender mounts. After that, the brazing will begin.
Part 2 - Brazing, Finishing: First, all of the brazed on small parts get dry fit and marked on the frame with sharpie. Holes are drilled for threaded mounts and other mounts are filed to match the curve of the tube. Once they are all set up and clean, each piece is clamped, fluxed, and brazed into place with either silver or bronze using an oxy/acetylene torch. The flux is cleaned of and all braze-ons are thoroughly checked, any adjustements are made.
Finally, the seat tube is notched and reamed, any inconsistencies are filed down, then the final alignment and quality check is done. Once everything passes inspection, it's off to the paint shop!



Wednesday, July 15, 2015
Bike Night 2015 at the MIA
I'll have a couple few frames on had to show and answer questions about. Come join the fun!
Riding through the doors of Minneapolis Institute of Arts for #BikeNightMIA Tomorrow!
Join us from 6-9 p.m. for a FREE night of art + bikes + brews.
RSVP and invites here: http://on.fb.me/1GuESVo
Saturday, May 23, 2015
Follow Black Ship on Instagram!
Updates from the shop, rides, new builds, works in progress, fun tools, dangerous! tools, new items, good beers, fun times, scattered with an occasional pic of really cute kids, dogs, and cats. See your bike or wallet being made!
Friday, May 22, 2015
Summertime Scheduling at the Shop
Summer is nearing: Updates and the summer schedule
As of this month, I am working at a new day job, 40hrs a week, welding in a small production shop. I have had to spend some extra time transitioning, but, David's Monster Cross is finished, bikes are getting painted, and repairs are still rolling through.
In the shop queue, I have a single wheel touring trailer, as well as racks for the Icebreaker, in the design stage that will hopefully come together over the next month or so. Mayday Cafe asked for a fifth rack for bikes out front so I will be working on that also.
As for frame builds, I will be accepting two more custom builds before fall, then I will most likely not be taking new customers as my partner will be in the U of M MSW program for the next year and a half. Of course, it's not that I don't want to be building, more realistically I won't be able to turn anything around in a timely manner.
That means that if you want to get in a summer track/road bike, fall cross ride or Icebreaker winter commuter, you'll need to get a deposit down and a spot in the queue in the next month or so to make sure you 'll have a spot and can get the tubes ordered and get it to the painter before the end of summer.
Also, a big shout out to Anthony at AP-Paints, always doing a bang up job, Ynez for letting me take care of her TIG welder, and David, Jamison, Alex, Natalie and all the encouraging friends and family for the support. It takes a community. Y'all rule.
As of this month, I am working at a new day job, 40hrs a week, welding in a small production shop. I have had to spend some extra time transitioning, but, David's Monster Cross is finished, bikes are getting painted, and repairs are still rolling through.
In the shop queue, I have a single wheel touring trailer, as well as racks for the Icebreaker, in the design stage that will hopefully come together over the next month or so. Mayday Cafe asked for a fifth rack for bikes out front so I will be working on that also.
As for frame builds, I will be accepting two more custom builds before fall, then I will most likely not be taking new customers as my partner will be in the U of M MSW program for the next year and a half. Of course, it's not that I don't want to be building, more realistically I won't be able to turn anything around in a timely manner.
That means that if you want to get in a summer track/road bike, fall cross ride or Icebreaker winter commuter, you'll need to get a deposit down and a spot in the queue in the next month or so to make sure you 'll have a spot and can get the tubes ordered and get it to the painter before the end of summer.
Also, a big shout out to Anthony at AP-Paints, always doing a bang up job, Ynez for letting me take care of her TIG welder, and David, Jamison, Alex, Natalie and all the encouraging friends and family for the support. It takes a community. Y'all rule.
Subscribe to:
Posts (Atom)







